1.CHECK CIRCUIT BETWEEN TCM AND CVT UNIT
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair or replace malfunctioning parts.
2.CHECK LINE PRESSURE SOLENOID VALVE
Check line pressure solenoid valve. Refer to TM "Component Inspection (Line Pressure Solenoid Valve)".
Is the inspection result normal?
YES >> Check intermittent incident. Refer to GI"Intermittent Incident".
NO >> Repair or replace malfunctioning parts.
Component Inspection (Line Pressure Solenoid Valve)
1.CHECK LINE PRESSURE SOLENOID VALVE
Check resistance between CVT unit connector terminal and ground.
Is the inspection result normal?
YES >> INSPECTION END
NO >> There is a malfunction of line pressure solenoid valve. Replace transaxle assembly. Refer to TM "Removal and Installation".